  1. Field Report: Deployment of Collaborative Arc Welding Systems in Munich Heavy-Industrial Sector
  2. 1.0 Executive Overview: The Munich Implementation
  3. 2.0 Technical Configuration and Synergy
  4. 3.0 Applied Engineering: Overcoming Thick Plate Variables
  5. 4.0 Lessons Learned from the Munich Field Site
  6. 5.0 Productivity Analysis: Manual vs. Collaborative
  7. 6.0 Final Technical Summary

Field Report: Deployment of Collaborative Arc Welding Systems in Munich Heavy-Industrial Sector

1.0 Executive Overview: The Munich Implementation

This report outlines the technical deployment and operational integration of a high-payload Collaborative Arc Welding System at a specialized heavy-machinery facility in Munich, Germany. The primary objective was to transition from manual Stick (SMAW) and semi-automatic MIG/MAG (GMAW) processes to a sophisticated **Automated Welding environment capable of handling Thick Plate Steel welding** (S355J2+N and S690QL grades).

Unlike traditional robotic cells that require extensive safety floor space and light curtains, the Munich facility demanded a flexible footprint. The synergy between human spatial judgment and the repeatability of a Collaborative Arc Welding System has proven vital for high-mix, low-volume production where tolerances in heavy plate prep (±2.0mm) often exceed the capabilities of “blind” traditional automation.

2.0 Technical Configuration and Synergy

2.1 Hardware Integration: The Collaborative Power Source

The system deployed utilizes a high-duty cycle (100% at 400A) power source integrated with a 12.5kg payload collaborative arm. In the context of Automated Welding, the synergy is found in the communication protocol between the power source’s “Intelligence” and the cobot’s motion controller.

In Munich, we utilized a “Digital Twin” approach for the initial path programming, but the real-world application required the operator to perform “lead-through programming.” This is where the Collaborative Arc Welding System differentiates itself: the welder physically moves the torch to the start point, sets the orientation, and logs the path. This hybrid approach reduced setup time for 40mm thick longitudinal seams by 65% compared to traditional teach-pendant programming used in older Automated Welding cells.

2.2 Material Focus: Thick Plate Steel Welding

The core challenge of this site was Thick Plate Steel welding. We were tasked with 30mm to 50mm V-groove and J-prep joints. The metallurgical constraints of S690QL (High-Strength Quenched and Tempered steel) require strict adherence to heat input limits to prevent softening of the Heat Affected Zone (HAZ).

The Collaborative Arc Welding System allowed us to implement multi-pass logic that would be exhausting for a manual welder but is easily handled via Automated Welding. By maintaining a consistent travel speed of 35 cm/min with a specialized weave pattern, we kept the cooling rate ($t_{8/5}$ time) within the 5 to 15-second window required for grain structure integrity in the Bavarian facility’s climate-controlled environment.

3.0 Applied Engineering: Overcoming Thick Plate Variables

3.1 Managing Root Pass Consistency

In Thick Plate Steel welding, the root pass is the most critical. Variations in the root gap (often caused by thermal expansion during tacking) usually defeat standard Automated Welding programs.

During the Munich deployment, we implemented a “Touch Sensing” routine. The Collaborative Arc Welding System uses the welding wire itself as a probe to find the plate surface and the groove side-walls before striking the arc. This allows the system to shift the entire pre-programmed path in 3D space to match the actual position of the workpiece. This “Sense and Adapt” logic is the pinnacle of modern Automated Welding in heavy industry.

3.2 Multi-Pass Offset Logic

For a 40mm V-groove, we calculated a 12-pass sequence.
1. Root Pass: 180A, 19V, Short-circuit transfer to avoid burn-through.
2. Fill Passes: 320A, 28V, Pulsed-spray transfer to maximize deposition while controlling spatter.
3. Cap Passes: 260A, 24V, fine weave to ensure aesthetic and structural fusion at the toes.

The Collaborative Arc Welding System handled the offsets automatically. Once the operator defined the first pass, the software calculated the 1.5mm lateral and 2.0mm vertical offsets for subsequent layers. This precision is unattainable in manual Thick Plate Steel welding over an 8-hour shift due to operator fatigue and arc-eye strain.

4.0 Lessons Learned from the Munich Field Site

4.1 Gas Coverage and Turbulence

One specific lesson learned in the Munich shop was the impact of the facility’s high-volume HVAC system. The air movement caused shielding gas turbulence, leading to porosity in the Thick Plate Steel welding samples.

* Correction: We switched from a standard gas nozzle to a high-performance “Large Diameter Gas Lens” and increased the Argon/CO2 (82/18) flow rate to 22 L/min. We also integrated a “Gas Pre-flow” and “Post-flow” delay into the Automated Welding sequence to ensure the weld pool was fully shielded during the critical solidification phase.

4.2 Thermal Distortion Management

When performing Automated Welding on thick sections, the heat accumulation is massive. We observed that after the 5th pass, the plates would pull by nearly 3mm.

* Solution: We utilized the “Collaborative” aspect of the system. The operator would pause the Collaborative Arc Welding System every three passes to check interpass temperatures using a calibrated infrared pyrometer. If the temperature exceeded 200°C (for S690QL), the system remained in a “Hold” state. This synergy between machine endurance and human metallurgical oversight prevented cold-cracking and hydrogen-induced cracking (HIC).

4.3 Wire Feed Consistency

In Thick Plate Steel welding, we used 1.2mm solid wire. We found that over long durations, the heat radiating from the 50mm plate would expand the contact tip, causing “burn-back” or erratic feeding.

* Engineering Adjustment: We upgraded to high-performance Chrome-Zirconium-Copper (CuCrZr) tips and implemented a water-cooled torch neck specifically for the Collaborative Arc Welding System. This allowed for a 100% duty cycle, enabling the Automated Welding process to run for 4 hours of arc-on time per shift without consumable failure.

5.0 Productivity Analysis: Manual vs. Collaborative

The data gathered from the Munich site over a 30-day period shows a significant divergence in performance metrics:

* Arc-on Time: Manual welding averaged 22% due to the need for frequent breaks and repositioning for Thick Plate Steel welding. The Collaborative Arc Welding System achieved an arc-on time of 74%.
* Defect Rate: The Ultrasonic Testing (UT) failure rate dropped from 4.2% (manual) to 0.5% (Automated Welding). Most manual failures were slag inclusions at the start/stop points; the cobot eliminates these by providing continuous 1-meter runs.
* Consumable Efficiency: We noted a 15% reduction in wire waste. The Automated Welding system maintains a perfect Stick-Out (Contact-to-Work Distance), ensuring a stable arc and significantly less spatter loss.

6.0 Final Technical Summary

The integration of a Collaborative Arc Welding System in Munich has redefined our approach to Thick Plate Steel welding. The “Munich Model” proves that Automated Welding is no longer restricted to thin-gauge automotive components. By leveraging the cobot’s ability to handle high-amperage, multi-pass heavy deposition while allowing the human engineer to manage thermal inputs and seam variations, we have achieved a 3x increase in throughput for heavy structural components.

Key takeaway for future deployments: Do not underestimate the need for high-end water cooling and advanced seam-sensing when moving a Collaborative Arc Welding System into the realm of Thick Plate Steel welding. The machine provides the consistency, but the engineering parameters must be tailored to the specific metallurgical behavior of heavy-section steel.

End of Report.
Lead Engineer, Munich Deployment Team

Machines for this application

View all Welding Robots →

Get a Technical Quote

Send us your material, thickness and working area. An engineer replies within 24 hours.